Engineer Ahmad Mousavi was the project manager of this project and has point out some of the special features and challenge associated with its construction.

The depth| special configuration and stepped foundation with on elevation difference of 3m | pouring 800 m3 of concrete in one day | depth of 22 m | the depth of excavation was more than its width between 6-7 m | providing the emergency stairs and cutting the soil.
Performing nailing operations for excavation stability.
Concrete volume 3500m3 and approximately 400 tons of steel| stracture build combining steel and concrete .
Comprised of a monolithic concrete basin from the excauation depth elevation to elevation +- 0.0 to the foundation which provides complete earthquake protection.
The structure does not have any cloums and two concrete curatain walls act as load bearing walls .
Controlling underground water caused by excessive excavation .
In all stages the concrete wall slump tested and substandard concrete was rejected.
Complete drainage behind concrete walls.
Utilizing2 layers of water-stop at all concrete joints.
Concrete additives used to increase strength and water
Due to lack of columns / plate beams (each weighing approximately 6 tons) were used
Using supended one sided forms up to 20 m in height on the ground .
All water basins are a combination of suspended steel and concrete .
Utilizing steel deck in 1 mm thickness
Utilizing suspended bridges at the spaces above the awimming pool in order to provide a magnificent view .
The exposed wall surfaces of the sports complex floors were poured using special Recli forms with ando design ( first time in Iran ) and using exposed concrete façade 5 cm thick as a unique finish .
Installation of 20 m2 unique tile mural attached to the wall
Constructing the steam sauna Turkish bath style
Special exterior with a combination of aluminum | glass and exposed concrete with 34 concrete pouring stages without any joints or columns in a suspended style. Over the façade
In addition to the standard water basin | a hallway for hydro therapy a waterfall and submersed sports equipment and 2 beds were built
Installation of approximately 200 m2 of barisole ceiling
Installation of a special thin wall finish similar to a mirror finish called seebo
Installation of extended aluminum mesh ceiling